| Site/Facility: | Coordinates: | ||
| Terminal Zone: | Date of Acceptance: | ||
| Address: | |||
| 1. EQUIPMENT | ||||
| Equipment | Brand/ Model | Serial Number | MAC Address | Status |
| Access Point 1 | ||||
| Modem | ||||
| 2. BANDWIDTH TESTING | |||||
| ACCESS POINT | ZONE/LOCATION | Download (Mbps) | Upload (Mbps) | Latency (ms) | Status |
| ACCESS POINT 1 | |||||
| 3. OTHER REQUIREMENTS | REMARKS | |
|
1. Signage provided, properly installed and met the required minimum size. A4: per Information Desk (Arrival and Departure) |
||
|
2. Signage provided, properly installed and met the required minimum size. Banner Tarpaulin: per Lounge |
||
| 3. ISP 1: 10 Gbps | ||
| 4. ISP 2: 10 Gbps | ||
| Overall Result: | Remarks: |
|
Inspected by: Engineer III, DICT-IMB-DRRMD
Information Systems Analyst II, DICT-IMB-CIIMD
Computer Programmer II, DICT-IMB-DRRMD
|
Accepted By: DICT End User Position
|